您现在的位置:首 页 > 体系认证 > IATF16949认证要求修订认可解释SI12-13
IATF16949认证要求修订认可解释SI12-13
IATF16949认证要求修订认可解释SI12-5.1.1.2 Process effectiveness and efficiency过程有效性和效率
Top management shall review the product realization processes effectiveness and efficiency of the quality management system and support processes to evaluate and improve their effectiveness and efficiency the organization’s quality management system. The results of the process review activities shall be included as input to the management review (see Section 9.3.2.1.).
高层管理人员应审查 产品实现过程和质量管理体系的有效性和效率,并支持过程以评估和提高组织质量管理体系的有效性和效率 。过程审查活动的结果应作为管理审查的输入(见第9.3.2.1节)。
Rationale for change改变原理:
Clarified that not every process requires an efficiency measure. The organization needs to determine which processes require efficiency measures within their quality management system. Additionally, the organization’s problem-solving processes need to have an effectiveness review conducted by the organization’s management.
阐明并不是每个过程都需要效率测度。组织需要确定在他们的质量管理体系中哪些过程需要效率测度。此外,组织的问题解决过程需要由组织的管理人员进行有效性审查。
IATF16949认证要求修订认可解释SI13-9.3.2.1 Management review inputs – supplemental管理评审输入-补充
Input to management review shall include:
a) cost of poor quality (cost of internal and external nonconformance);
b) measures of process effectiveness;
c) measures of process efficiency for product realization processes, as applicable;
d) product conformance;
e) assessments of manufacturing feasibility made for changes to existing operations and for new facilities or new product (see Section 7.1.3.1);
f) customer satisfaction (see ISO 9001, Section 9.1.2);
g) review of performance against maintenance objectives;
h) warranty performance (where applicable);
i) review of customer scorecards (where applicable);
j) identification of potential field failures identified through risk analysis (such as FMEA);
k) actual field failures and their impact on safety or the environment.
管理评审的输入应包括:
a) 不良质量成本 (内部和外部不符合的成本);
b) 过程有效性的测量;
c) 产品实现过程的过程效率测度, 如适用;
d) 产品符合性;
e) 对变更现有业务和新设施或新产品的制造可行性进行评估(见第7.1.3.1节);;
f) 客户满意度(见ISO 9001,第9.1.2节);;
g) 根据维护目标审查绩效;
h) 保修绩效 (如适用);
i) 审查客户记分卡 (如适用);
j) 通过风险分析(如FMEA)识别潜在的现场故障;
k) 实际现场故障及其对安全或环境的影响。
Rationale for change改变原理:
Clarified that not every process requires an efficiency measure. The organization needs to determine which processes require efficiency measures within their quality management system.
阐明并不是每个过程都需要效率测度。组织需要确定在他们的质量管理体系中哪些过程需要效率测度。
证书查询
图文展示
IATF16949认证标准IATF16949:2016版第四次修订认可解释SI14IATF发布官方最权威关于IATF16949认证标准修订认可解释
铁路行业ISO/TS22163认证标准取代IRIS认证标准转换指导了解铁路行业认证标准掌握最新版TS22163转换认证时间表
如何申请GJB9001认证之GJB9001C认证条件与准备企业如何申请GJB认证呢?需要具备什么条件又该如何准备认证呢?
AS9100认证体系适用范围及作用介绍AS9100认证体系产生、作用及适用企业范围
最新ISO13485认证标准2016版主要变化与特征简要介绍最新版ISO13485认证标准主要变化以便企业换版参考
汽车质量管理体系IATF16949认证申请条件和要求IATF16949认证标准取代ISO/TS16949认证标准后适用范围有变化
IAF正式发布ISO9001:2015版转换实施指南ISO9001:2015版发生了很大变化,如实顺利低成本换版是很多企业关注焦点。
QC080000管理体系认证咨询为何需要QC080000认证?QC080000适合哪些企业?如何办理QC080000认证?
电讯业TL9000管理体系认证咨询知名公司加速市场开发
规范提升企业管理
专业高效认证咨询模式
电讯行业质量管理体系
咨询电话:4000-816-938
在线客服